| 
		the film forum library tutorial contact  | 
	
		 
	 | 
		U.S. Awards HCMS Cavitation Repair
		by PennWell
		 | 
Hydro Consulting & Maintenance Services Incorporated was awarded a contract for cavitation repair at the Lower Granite dam and hydro project.
The 810-MW Lower Granite dam and hydroelectric project is on the Snake River in Washington.
The cavitation repair contract, awarded to HCMS by the U.S. Army Corps of Engineers, is valued at $4.62 million.
The HCMS contract covers cavitation repair of units 3-6.
Construction of Lower Granite began in July 1965. The main structure and three generators were completed in 1972, with an additional three generators finished in 1979.
Lower Granite Dam is part of the Columbia River Basin system of dams.
	learn more on topics covered in the film
	see the video
	read the script
	learn the songs
	discussion forum