| 
		the film forum library tutorial contact  | 
	
		 
	 | 
		Lock Work to Halt River Shippingby Vicki HillhouseWalla Walla Union-Bulletin, July 28, 2010  | 
WALLA WALLA -- The floating freight system that carries millions of dollars in grain and steel out of Walla Walla each year will be shut down for three months in a massive overhaul of the Columbia-Snake River navigation system.
The U.S. Army Corps of Engineers plans to shut down the river to transportation as part of a 13-week, $13.2 million replacement of the Lower Monumental Dam navigation lock.
The closure is part of a larger $46 million repair of the navigation system that stretches from Vancouver, Wash., to Lewiston, Idaho -- a major conduit in the Pacific Northwest transportation network.
	learn more on topics covered in the film
	see the video
	read the script
	learn the songs
	discussion forum